top of page

Firewall and baggage area

I started today by riveting on the mid cabin braces. I then back riveted the stiffeners to the baggage floor Next was attaching the...

Gear towers to floor

The next step is to rivet the towers to the floor. After clecoing then to the floor, I lightly clamped the assembly to the table for...

More forward fuselage work

While waiting for the kids to get ready for a hike, I drilled the last of the bolt holes into the weldments I then installed all of the...

Weldment Assembly

I had a few minutes this evening, so I started bolting the weldments into place

Forward floor and gear towers

I started out today by riveting on some nut plates, and then drilling countersinks around them. I then started setting up the floor...

Primer and firewall assembly

First thing this morning, I started primer on all of my parts After it cured, I began assembly in the firewall by clecoing it together. I...

Primer prep

Payton had to try it before taking everything back apart. I’m not sure what Peter was inspecting. everything is ready to go, but will...

Test fit

I had to throw evening together before primer. Peter decided to try it out.

Forward baggage parts

The next parts to prep are for the forward baggage compartment These went together pretty quickly Next steps are to take everything back...

Finding more parts

I had a few minutes this evening, so I dug put more parts for the fuselage.

De-burring and drilling

Now that I got my replacement for skin, I was able to finish drilling the floor stiffeners. These got de-burred and dumped as needed....

More firewall parts prep

I worked through the firewall section by finishing deburring the parts I had drilled previously The next step was to bend the firewall. I...

Look, An Intact Crate!

My replacement parts came today, in much better shape than the first delivery I continued putting the gear tower pieces together.

Some Shop Work

I cleaned up my shop a bit by repurposing some of the crates to make a cart for my drill press and band saw.

Forward Floor

I already ran into my first missing piece that was a result of the damaged components. I still worked through deburring parts as I...

More Firewall work

I wrapped up de-burring and cleco-ing the firewall parts today.

Inventory and Firewall

I still had a few of the bundles to inventory, so I got that completed before starting on assembly efforts. I stored the pieces both on...

The Fuselage Kit Arrives...

My fuselage crate finally made it to my house. Although it was not in one piece. This is what it looked like still on the truck In...

Pitot tube plumbing

this is the last of the loose pieces I have, other than the lower skins and fiberglass parts. I wrapped this up with parts I ordered from...

Attaching flaps

I rigged and drilled the flap hinges today. I used the aileron rigging jig to help line the trailing edges up.

Blog: Blog2
bottom of page