top of page

Firewall and baggage area

  • Writer: Matt DeCraene
    Matt DeCraene
  • Jun 7, 2021
  • 1 min read

I started today by riveting on the mid cabin braces.

I then back riveted the stiffeners to the baggage floor

Next was attaching the firewall.

I moved the entire floor assembly up onto some sawhorses for access while riveting. I will need some better structure as I move on to the next section of fuselage


Comentários


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page