top of page

More forward fuselage work

  • Writer: Matt DeCraene
    Matt DeCraene
  • Jun 5, 2021
  • 1 min read

While waiting for the kids to get ready for a hike, I drilled the last of the bolt holes into the weldments

I then installed all of the bolts that hold them together.

I wrapped up the day with some smaller RV work



Comentários


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page