top of page

Forward Floor

Writer's picture: Matt DeCraeneMatt DeCraene

I already ran into my first missing piece that was a result of the damaged components. I still worked through deburring parts as I could. I am also waiting on some Boelube to drill the firewall parts.

All of these parts were taken as far as they could without actually having the floor skin. Here are the two parts waiting for things to be delivered.


I also started digging out the parts for the landing gear towers.




 
 
 

Kommentare


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page