top of page

Forward floor and gear towers

Writer's picture: Matt DeCraeneMatt DeCraene

I started out today by riveting on some nut plates, and then drilling countersinks around them.

I then started setting up the floor assembly to rivet. one of the floor supports does not get riveted at this point, so I made sure to clearly mark those holes

I then moved on to riveting the parts to the floor.

To wrap up today, I riveted the main gear tower structure together. All of these parts can be traveled with a squeeze, so it went together really fast.


 
 
 

Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page