top of page

More Tank Prep

  • Writer: Matt DeCraene
    Matt DeCraene
  • May 17, 2020
  • 1 min read

I primed the Z brackets and inboard angle. These parts should not be in a potential leak path for fuel, since the goal is to keep fuel from getting past fillets on the inside of the tank.

After Primer.

I used the squeezer to install all of the nutplates on the z brackets.

I also riveted the nutplates onto the spar where they were required.


 
 
 

Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page