top of page

More canopy drilling

  • Writer: Matt DeCraene
    Matt DeCraene
  • Nov 25, 2023
  • 1 min read

Leslie came out to help drill the canopy holes to size. She missed once.

ree

We drilled everything to size.

ree

After Peter and Payton helped me out the canopy on, Peter had to try it out.

ree

Everything is drilled and ready to start working on the canopy


ree

Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page