top of page

HS Rework - SB 14-01-41 - Part 5

  • Writer: Matt DeCraene
    Matt DeCraene
  • Apr 17, 2022
  • 1 min read

I started out today by assembling some of the pushrod parts I had painted, which are now sufficiently dry.

ree

ree

I also riveted the bellcrank together.

ree

The first thing I did on the HS was install the missing rivet.

ree

Then came installing the rivets through the doublers and angles. These could all be squeezed easily. I made sure to keep the attachment holes open.

ree

Then the rivets inside the HS were installed. These were not to bad with the tungsten bucking bar.

ree

finished doubler installation with holes left open for the ribs.

ree

The following step is to clamp the new flanges in place to match drill those assemblies.

ree

Then, the ribs are removed to drill the attachment holes.

ree

Here is the other side ready to go.

ree

Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page