top of page

HS Rework - SB 14-01-41 - Part 3

Writer's picture: Matt DeCraeneMatt DeCraene

My parts arrived last week, so I was able to get started putting the HS back together. First, I deburred the doublers.

Then, clamped everything in place to match drill the new holes in the doublers to the existing parts.

Finally, I flipped the assembly back over to allow match drilling the existing holes into the doublers.


Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page