More Tank Prep
- Matt DeCraene
- Sep 5, 2020
- 1 min read
With the Z brackets on the rear baffle, I match drilled the remaining holes.

The rear spar is all ready to accept the tank.

All the main ribs and skin are now drilled and ready to be deburred and dimpled.

Comments