top of page

More Tank Prep

Writer's picture: Matt DeCraeneMatt DeCraene

With the Z brackets on the rear baffle, I match drilled the remaining holes.

The rear spar is all ready to accept the tank.

All the main ribs and skin are now drilled and ready to be deburred and dimpled.


 
 
 

Recent Posts

See All

Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page