top of page

More wing prep

  • Writer: Matt DeCraene
    Matt DeCraene
  • Dec 6, 2020
  • 1 min read

After wrapping up the leading edge riveting, we finally did a test on the fuel tank. Payton helped some more on the leading edge.



we then bolted The tank top the spar, and clecoed the top skin on.


Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page