top of page

More wing prep

  • Writer: Matt DeCraene
    Matt DeCraene
  • Dec 6, 2020
  • 1 min read

After wrapping up the leading edge riveting, we finally did a test on the fuel tank. Payton helped some more on the leading edge.

ree


we then bolted The tank top the spar, and clecoed the top skin on.

ree

Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page