top of page

More wing prep

Writer's picture: Matt DeCraeneMatt DeCraene

After wrapping up the leading edge riveting, we finally did a test on the fuel tank. Payton helped some more on the leading edge.



we then bolted The tank top the spar, and clecoed the top skin on.


 
 
 

Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page