top of page

Wrapping up an Aileron

  • Writer: Matt DeCraene
    Matt DeCraene
  • Feb 12, 2021
  • 1 min read

I started closing it the first aileron by driving the solid rivers along the top skin

A finished top skin with the end ribs clecoed in place

I flipped the skin over and weighed it down with a sandbag in preparation for the pulled rivets

After completing all of the pulled rivet, I had a finished aileron

I then it into the wing without making the spacers I will have to go back and do that at some point

I then got ready for the other one


Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page