top of page

Wrapping up an Aileron

Writer's picture: Matt DeCraeneMatt DeCraene

I started closing it the first aileron by driving the solid rivers along the top skin

A finished top skin with the end ribs clecoed in place

I flipped the skin over and weighed it down with a sandbag in preparation for the pulled rivets

After completing all of the pulled rivet, I had a finished aileron

I then it into the wing without making the spacers I will have to go back and do that at some point

I then got ready for the other one


 
 
 

Yorumlar


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page