top of page

Tank Ribs, take 1

  • Writer: Matt DeCraene
    Matt DeCraene
  • May 25, 2020
  • 1 min read

I reinstalled the ribs in preparation to start rivetting the. I was pretty optimistic on how long it would take me to get them installed. I mixed my proseal in 100 gram batches, which is about enough for two ribs.


I also made a little plate to cover this tooling hole. Van says to use a large rivet, but I did not have any that size.

Like I said, I was optimistic with how long it would take me to rivet one rib. This first one took me the whole working time. It would help if my bench was just a little shorter. It was hard to reach the nose rivets.


Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page