top of page

Still Fitting Leading Edge

Writer's picture: Matt DeCraeneMatt DeCraene

After Re-adjusting the leading edge, it fit much better. I then match drilled all of the holes

I also put the end rib and joint plate in. Here is the plate showing the equal overhang on both sides of the plate.


I clamped the join plate in place while drilling the first couple of holes.

After drilling the leading edge, I started getting tank parts out. Once I start on the tanks, I will have some decisions to make. Flop Tube vs no flop tube, fuel returns for systems that require them. Fuel Senders, etc.



 
 
 

Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page