top of page

More Flaps

  • Writer: Matt DeCraene
    Matt DeCraene
  • Mar 7, 2021
  • 1 min read

I started riveting one of the flaps together today. It was a challenge getting into some of the areas with the bucking bar.

ree

Ready for some more riveting

ree

End rib installed with doublers

ree

Other flap ready to go.

ree

Completed Flap

ree

I also added another regulator and air hose to the garage. The flap required many changes from the rivet gun to the squeezer. This way I can have pressures set for both.


ree

Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page