top of page
  • Writer's pictureMatt DeCraene

More cockpit floor work

I asked Leslie to help me with a couple of things, and these are the shoes she put on…

I was able to temporarily install my fuel pump assembly I need to order longer bolts though these bolts into the mutates Leslie helped me with. The entire assembly comes out with the removal of two fuel lines and 4 cap screws, though I need to add a clamp for the long return line

One more view of the assembly.

I drilled holes for nut plates at the aft control support.

Then I got the forward floor in place.



2 views0 comments

Recent Posts

See All
Post: Blog2_Post
bottom of page