top of page

Leading Edge Riveting

  • Writer: Matt DeCraene
    Matt DeCraene
  • Dec 5, 2020
  • 1 min read

Payton helped me wrap up the leading edge by getting the nut plates installed on the join plate

ree

After riveting those, we dropped it on the spar.

ree

All ready to rivet.

ree

Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page