top of page

Happy New Year

Writer's picture: Matt DeCraeneMatt DeCraene

Leslie to a picture of me while I was tightening some of the bolts that hold this weldment in.

After a little bit of time, I was able to get them all installed.

The next step per the plans is to flip the fuselage again, and do the gear leg install. Instead, I decided to start running fuel lines. I pulled my parts out and proceeded to destroy a clamp opening the hole to clear a -4 bolt I will need to order a new one


 
 
 

Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page