top of page

Fuselage assembly begins

  • Writer: Matt DeCraene
    Matt DeCraene
  • Nov 20, 2021
  • 1 min read

Darren came by to help be out a bit. having a second set of hands made dimpling the long skins much easier. While I was waiting for him, I riveted these seat belt brackets, that I skipped over because they had not been primed.

ree

Next up was the lower lingering installation I installed the bolts, torqued them and then marked them with torque seal so I knew they were tightened.

ree

Same with the bolts in the landing gear weldments.

ree

here are some of the rivets on the lower longerons.

ree

I next moved on to the mid canon braces to the center section.

ree

Then I got Leslie to help me out the seat rib assembly in place.

ree

Moving on, the rear spar bolt gets installed and torqued.

ree

Pieces start getting big fast at this point. It makes for an exciting day of building

Comentarios


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page