top of page

Fuselage Assembly

Writer's picture: Matt DeCraeneMatt DeCraene

I clecoed on the side rails in preperation for drilling the longerons.

Peter helped me build some harbor freight saw horses. I will pick the fuselage up off of the ground to make it easier to drill the lower longerons.


 
 
 

Comentarios


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page