I finished installing the stall warning horn to get it out of the way.
I even installed the access panel. I figure the easiest way to keep track of all of these is to put them together as much as possible.
I got the tank bolted in place with most of the Z brackets installed. I ordered some short wrenches, as clearance fore these bolt heads could have been a little larger. I must not have offset these as far as needed.
The skins are installed and ready to go.
I made a test piece with the elevator skin that I replaced and a piece of scrap to practice on for my helper.
Comments