top of page

Final prep before riveting

  • Writer: Matt DeCraene
    Matt DeCraene
  • Jul 15, 2020
  • 1 min read

I cleaned up out in the garage to prevent kid damage. I installed the join plate in the leading edge with clecos.

And then put the top skins on. I only put a couple of clecos in for now, just to get them up and out of the way.

The bottom skins I stashed safely back in the shed in the crate.

The only things left to do at his point is to start riveting the leading edge. I am holding off on drilling for the pitot tube, as I will likely use a heated tube instead of the standard bent aluminum.


Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page