top of page

Elevator rigging

Writer's picture: Matt DeCraeneMatt DeCraene

I started by drilling the hole for the pushrod attachment.

Peter had a friend over that helped him tighten some fasteners on the pedals.

I was able to get the elevator down travel stops adjusted limits are 20/25, both bellcranks are touching the stops at 24.1. I started on the up stops, but those are harder, since the bellcrank hits the stop angle and the opening in the top deck, which can’t be removed .


 
 
 

Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page