top of page

Control installation

  • Writer: Matt DeCraene
    Matt DeCraene
  • May 1, 2022
  • 1 min read

Today I worked on putting the aft elevator pushrod in, I will have to take some of these components back out later to put the pitch servo in, and adjust the elevator travel,

Another view of the pushrod

I also ran the rudder cables the length of the fuselage.


Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page