top of page

Continued Work on Left Elevator

  • Writer: Matt DeCraene
    Matt DeCraene
  • Sep 7, 2019
  • 1 min read

I finished deburring, dimpling and countersinking as required on the frame and skin of the elevator. I also installed nutplates around the trim actuator opening now. I had planned on installing these before the stiffener, which would have allowed me to squeeze all of them. Instead, some had to be bucked.


The next picture shows the substructure

ree

Skin dimpled and deburred

ree

Trim Servo stiffener with nutplates installed


ree

Comentarios


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page