I finished deburring, dimpling and countersinking as required on the frame and skin of the elevator. I also installed nutplates around the trim actuator opening now. I had planned on installing these before the stiffener, which would have allowed me to squeeze all of them. Instead, some had to be bucked.


The next picture shows the substructure

Skin dimpled and deburred

Trim Servo stiffener with nutplates installed