top of page

Center section prep work and more

  • Writer: Matt DeCraene
    Matt DeCraene
  • Jun 26, 2021
  • 1 min read

I started some prep work on the center section and the remaining floor assembly parts

I started working through debuting and fumbling the floor parts as required

My pile of parts ready to paint is growing

Just a handful remaining.


Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page