top of page

Baggage Door

  • Writer: Matt DeCraene
    Matt DeCraene
  • Feb 4, 2023
  • 1 min read

I climbed upside down to rivet the inner skin on the baggage door today.


Parker came out to help by handing me rivets and laughing.

After it was riveted, I took it off to attach my hinges with shims. These will have to be adjusted still.

A final video of the completed door working. I still need to put the gas strut on, but the geometry allows it to stay open as is.


Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page