top of page

Aft Fuselage

  • Writer: Matt DeCraene
    Matt DeCraene
  • Sep 17, 2022
  • 1 min read

I continued on the aft top skin work. I drilled the gussets, which required moving the bulkhead out of the way after the first three holes were drilled.

The top skin got pretty scratched by the bulkheads while I was fitting it, so I decided to prime the inside of it. I scuffed it and rolled the edges before adding dimples.

After dimpling it will be ready for assembly.


Komentarze


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Matt's RV Build Log. Proudly created with Wix.com

bottom of page