I continued on the aft top skin work. I drilled the gussets, which required moving the bulkhead out of the way after the first three holes were drilled.
The top skin got pretty scratched by the bulkheads while I was fitting it, so I decided to prime the inside of it. I scuffed it and rolled the edges before adding dimples.
After dimpling it will be ready for assembly.
Comments